Projects

We have worked with amazing clients that have trusted in us.

 

Four Seasons Brickell Miami

 

Supplied and installed lobby glass and steel sculpture, 2” thick laminated glass for exterior walls at entrance, ballroom mirrors.

 

Ten Museum – High rise condominium project(244 units) – Miami, FL.

 

General Contractor: Bovis Lend Lease, supplied and installed tempered glass, extrusion and hardware for custom made sliding closet doors, frameless shower enclosure and safety mirrors for vanity.

 

Hyatt-Bonaventure Hotel – Weston, FL

 

Owner hired renovation (280 units)– removed existing shower enclosures, provided and installed tempered glass including hardware for the frameless shower enclosure.

METROPOLITAN 1 (MET 1) – Condominium project - Miami, FL

 

General Contractor: Bovis Lend Lease, supplied and installed tempered glass including hardware for frameless shower enclosure on all units.

 

Marriott Hotel - Newport Beach, CA

 

Contractor: ISEC, Inc, supplied tempered glass for the frameless shower enclosure.

 

Canyon Ranch (Carillon Hotel) – Miami Beach, FL

 

General Contractor: Bovis Lend-lease, supplied, shower glass enclosures and mirrors for both the South Tower Condo and the Hotel.

Lobby: supplied and installed three sets of columns using glass with Onyx and glass laminated with wood.

Staircases: supplied and installed 4 sets of glass stairs cases and railings.

Ritz Carlton Puerto Rico

 

Supplied and installed glass railing and shower enclosures for the hotel.

 

Grand Beach Hotel

 

Supplied and installed shower enclosures and mirrors.

 

Aqua Condo – Miami Beach FL

 

Contractor - Turner Construction: glass staircase and elevator lobby glass.

Latitude on the River: Downtown Miami

 

Contractor: Suffolk Construction: glass staircases and glass sculpture with LED lights suspended from the ceiling

 

Ritz Carlton: Miami Beach

 

Contractor: Coastal / Hoar Construction: specialty glass with water feature for spa

 

Fontainebleau II: Miami Beach

 

Contractor: Turnberry Construction: supplied and installed specialty colored glass for all the elevator lobbies as well as glass sculpture in the lobby.

Elysee: Miami

 

Contractor: John Moriarty and Associates: Supplied and install shower enclosures and WC doors in 99 high end five-bath units.

 

AMLI Midtown – Midtown Miami

 

John Moriarty and Associates: supplied and installed frameless shower enclosure units for THREE Towers (700 units)

Contact us.

We’d love to hear from you on how we can help you. Just simply click the button to contact us and we’ll get back to you as soon as we can.